I'm sorry for my daa and a long absence, there are two extra off-topic photos.
I'm just now from my fitting and 3s jaa I have photos with it = D. The sample part is complete. I will now cut the average small and then sit down to the weaving - the right base. The matter was finally sent on Friday, thank God and hopefully middle of next week there! ^ ^. Sooo here myself at times the try-3s.
It is finished! It is finished! No more of this ridiculous Vorhangsstoffdingsda XD. Now it gets serious, because here we go fufufufu the right materials! Sooo
and because I was away so long (or did not do anything because of the oral Matura School on 11 June) is a photo of my graduation / graduation or diploma and Graduate jacket, as it is referred to as such. 100% linen and 22 1 / 2 hours produced. Skirt and jacket have been fed and are currently on display in the auditorium. From autumn to the whole can for a time in the EO (Shopping Centre Oberwart) survey =).
aaand - I've struggled through it and was Thursday at the travel agency in Stegersbach = D. I had seen the offer / package and then I just could not say no, because I like bus travel so and wanted to see her ~. 99, - poorer but I'm so sure! The two "cards" are of two New York t-shirts, which I also bought Thursday = D.
0 comments:
Post a Comment